Loading of the (unpaired) parts via basket stacks, separation of the baskets with gantry, loading of the workpiece trays, loading of the workpiece trays into the machine, set-up of the workpiece trays parallel to production time and removal of the now paired parts – and all this with a cycle time of 3 seconds.